Layout

Cylinder and TIG Rod Storage on a Welding Cart

The rear row behind the bench is only 13½" deep, but it holds two cylinders up to 250 cu ft, a plasma cutter and five 40" TIG rod tubes. Here's how it's packed.

YUKON BENCH46⅛ × 18³⁄₁₆, casters offWELDER+ COOLER11 × 28leads ~4"CYLCYLPLASMA~18 × 10 bay2 shelves aboveupper L shelf▲ spine posts rest on the bench backback flushvent3⅜"controls face frontFRONT · you stand hereREARCYLINDER ENDWELDER END62"33"18½"13½"
Top view, looking down on the deck. Black rectangles are the vertical posts. The dashed orange outline is the upper L shelf.
  • Vertical 1×2 post
  • TIG rod tubes
  • Lead and power-cable coils
  • Lead clearance

Two cylinders on the spine

The cylinders stand just behind the spine posts, directly over crossmember H, so their weight goes straight into the frame. Two chains, about 36" each, hook to eyes on the back of the cylinder upright and the shared upright. They wrap each bottle at about 18" and 34" above the deck, roughly a third and two thirds of bottle height.

Secure every bottle

Chain both cylinders at both heights every time you load one, and keep valve caps on bottles that aren't connected. With two full 250s aboard, lock the casters while you work and push the cart from the bench end.

TIG rods in capped PVC tubes

Five 1½" Schedule 40 PVC tubes, 40" long, stand in the cylinder-end corner of the rear row. Each has a glued cap on the bottom and a slip cap on top, so rods stay clean and dry and you can sort them by alloy and diameter. Two 11" rebar rails at 4" and 28" above the deck, running back from the cylinder upright, clamp the tubes in place. The top rail is rebar rather than 1×2 to give the cylinders more room.

Plasma bay and shelves

The plasma cutter sits in a bay about 18" wide between the shared upright's gusset and the shelf post. Above it, the middle shelf sits flush with the bench top, with about 15" of clearance underneath. Above that, the upper L shelf wraps from behind the bench over the top of the welder, 12½" above the bench top.

Leads and power cable

Nothing hangs inside the footprint. A 5/8" rebar rail runs between the two welder-end posts, 31" above the deck, with four short hooks pointing out past the end: two for the leads, one for the helmet and one for the power cable. The coils hang about 2" outside the cart. See the 3D model from the welder end.

Related reading